Back to blog

Derry property guide

EICRs in Northern Ireland: checks for private landlords

Check your Derry rental electrical report, inspection date, remedial work and tenant copies. An EICR booking alone does not complete the safety duties.

Check the report and the follow-up, not just the booking

Northern Ireland's electrical safety regulations cover the fixed electrical installation in private tenancies. The rules applied to new tenancies from 1 April 2025, with existing tenancies required to comply by 1 December 2025. Those dates have passed: an older tenancy is not a reason to leave the check for a future change of tenant.

Inspection and testing must be carried out by a qualified person at intervals no longer than five years, or sooner where the report requires it. An Electrical Installation Condition Report, usually called an EICR, records findings. Booking a visit or paying an invoice is not the same as receiving a report and completing its required actions.

Ask for a clear inspection quotation

Give the inspector the address, property layout, previous report and details of electrical work since that report. Explain whether the property is occupied and agree access with the tenant. Ask what the quotation includes, what information the inspector needs and how any limitations will be recorded.

Keep the inspection cost separate from an allowance for work that has not yet been identified or priced. Ask how urgent findings will be communicated and who will provide the completed report. This makes it easier to compare quotations on scope rather than selecting the cheapest number and discovering that it describes a different job.

Read the outcome before filing the document

Check the address, inspection date, overall outcome, observations and next inspection date. If anything is unclear, ask the qualified person to explain it. Do not decide from a photograph of a consumer unit that an installation passes, or assume a recent decorative refurbishment means the electrical system was inspected.

Department for Communities guidance distinguishes C1 danger, C2 potential danger and FI further investigation from C3 improvement recommendations. Ask the inspector to identify the action and urgency for each finding. This guide is not a method for diagnosing electrical faults or doing repairs yourself.

Close out remedial work and document delivery

Regulation 3 requires further investigation or remedial work within 28 days of the inspection, or a shorter period specified in the report. Immediate danger must not be left until a diary deadline. Obtain the qualified person's written completion confirmation and provide it with the report to tenants and the council as required by the regulation.

For the inspection report itself, the rules require a copy for existing tenants within 28 days, new tenants before occupation, prospective tenants within 28 days of a request, and the council within seven days of a written request. Retain the report for the next inspector. These delivery tasks belong on the same checklist as the work, not in a separate pile of unread emails.

Keep a usable electrical record

Use one file containing the latest report, each observation awaiting action, the agreed appointment, completion evidence, copies supplied and the next review date. Retain earlier reports rather than overwriting them. When an agent changes, ask for this complete sequence so the new manager can distinguish an unresolved item from one already addressed.

An EICR concerns the fixed installation; it is not a substitute for checking landlord-supplied appliances or the other duties that apply to the letting. HMOs have their own licensing framework, so confirm that route where relevant. HPD can provide a guide rental range, but neither that estimate nor a high asking rent establishes electrical safety.

For the separate pricing question, read the Derry rental valuation guide. A rent estimate is not permission to let.

Keep a separate record for rental smoke, heat and carbon monoxide alarms.